Define the stage and its responsibilities
Record every requested change against a product reference. Ask what documents must be approved before production and how later revisions affect the order. Keep the approved specification connected to the quote, inspection plan and packing information.
The information to keep together
- Product reference and requested changes
- Dimensioned information
- Material and finish selections
- Sample or drawing approval
- Production and revision milestones
Create a clear approval record
Use the same item references throughout the purchase. For each milestone, record what is being reviewed, who must approve it and where the accepted version is stored. If a supplier proposes a substitution or revised date, connect the change to the affected products and the people responsible for the next stage.
A useful handover to the next stage
| Record | Purpose |
|---|---|
| Master item schedule | A shared reference for the products and quantities involved. |
| Approved selections | The accepted dimensions, materials, finishes or documents. |
| Open questions | Specific points that still need a supplier response or project decision. |
| Next responsibility | The person or organisation that takes the next action. |
Develop the practical specification
Define what is being customised
Separate a change in dimensions, configuration, finish or construction. Each can trigger different feasibility and approval questions. Explain the reason for the requested change and identify the actual room constraint. Ask the supplier to describe what it can manufacture and which details need further development. A custom label does not establish that every feature is unique or that all alternatives have the same production process. The final order should identify the accepted changes against a stable product reference.
Use the right approval object
A colour chip can establish a finish direction, a drawing can establish dimensions and an identified prototype can demonstrate a particular assembly. These are complementary forms of evidence. Decide which are needed for the project and record what each approval covers. If a sample contains temporary components or differs from the intended production version, list those exceptions. Keep the accepted sample reference connected to the final specification so it remains useful when the order is checked before packing.
Control substitutions and later revisions
Agree how changes are proposed after approval and which documents are updated. A substitute fabric, hinge or material may affect more than appearance, so ask for its actual identity and the relevant information. Have the responsible designer or installer review any changed interface. Before production proceeds, confirm which revision the supplier has acknowledged and how the change affects programme or price. At delivery, inspect against that accepted package rather than comparing the goods with an earlier concept that has since been replaced.
Read the detailed product knowledge
- Kitchen cabinet carcasses: materials, joints and an inspectable specification
- Wardrobe hardware: doors, drawers and the clearances that drawings must resolve
- Bathroom vanities: moisture exposure, service access and installation interfaces
- Tile and stone specifications: samples, batches, layouts and care
- Kitchen appliance and cabinet coordination: prevent drawings from drifting apart