PRODUCTS & MATERIALS

Wardrobes & storage from China

Define this part of the purchase

Separate freestanding storage from fitted cabinetry in the purchase schedule. For fitted work, identify who measures the site, approves the drawings and installs the finished products. Track changes through a single approved drawing revision.

Details to include in your enquiry

  • Measured room and installation dimensions
  • Internal arrangement and storage needs
  • Door, drawer and hardware selections
  • Finish samples and drawing revisions
  • Installer responsibility and site readiness

Connect each detail to the item reference and the supplier’s written response. Record which decisions require approval before the order progresses.

Keep the category connected to the master schedule

Record the agreed quantities, selected options and any outstanding questions before accepting the final proposal. Use stable item references across the quote, drawings where relevant, inspection records and packing list. When a change affects another supplier or the destination installer, update the master schedule and obtain the necessary review.

Design and planning · Custom specifications · Delivery planning

Sources and further reading

    Supplier pages describe their published offerings. Product selection and project-fit guidance are our editorial analysis. Read our editorial policy.

    Develop the practical specification

    Approve movement as well as elevation

    A wardrobe’s closed elevation shows its appearance; open-position drawings explain how it works. Review doors, drawers and pull-outs with the actual bed, wall and entrance positions. Ask the cabinet maker to resolve the geometry of the specified hardware. Internal accessories should be itemised rather than inferred from a styled photograph. A main bedroom and a guest room may share fronts while requiring different storage, so keep the room-specific internals visible in the schedule.

    Coordinate finished measurements

    Identify who measures the destination and which surfaces are included. A drawing based on unfinished walls or floors needs a stated relationship to the completed opening. Agree how fillers, finishing panels and site adjustments are handled, and keep that information with the installation scope. The correct approach depends on the actual cabinet and building. Where attachment or stability provisions are required, the responsible installer should use the appropriate instructions and project assessment rather than improvise from a catalogue image.

    Retain hardware identities

    Soft closing or full extension describes a function rather than a complete hardware reference. Request the actual manufacturer and model, with the application information used by the cabinet maker. Keep adjustment and maintenance instructions with the final compartment drawing. At handover, operate the agreed movements and document unresolved points against individual compartments. A precise reference helps the supplier identify a replacement runner, hinge or fitting without treating the entire wardrobe as one unidentified item.

    Read the detailed product knowledge

    Article summary

    Plan storage around the contents, the room and the way doors and drawers open.